Harbor AI 2.0 quality inspection product

Harbor AI 2.0
Equipment Quality Inspection Platform

Designed measurement plans, reference libraries, quality decisions and feature-deviation analysis around multi-model factory-inspection requirements, turning one sensor fixture into a product for unit-by-unit testing.

Role
Lead developer responsible for the inspection product. Designed the measurement-plan, work-order, and unit hierarchy and UI. Led algorithm design and experiments for stage- and point-specific references, thresholds, pass/fail decisions, and feature deviations, and trained users on site.
Results and status
Delivered configurable measurement, reference comparison, and deviation analysis workflows and trained operators on site. The software workflow passed Phase 2 acceptance. Phase 3 is testing whether the measurements can reliably distinguish passing from failing units, with additional samples and field validation planned.
Record period
2026 testing and integration records

Context and objectives

Different equipment models require different stages and measurement points. Inspection needs configurable plans, trustworthy references, per-item decisions and deviation tracing rather than a single monitoring history containing every test item.

I lead development and own delivery for the inspection product, including the solution, domain model, algorithms, experiments, and on-site training. Phase 2 completed software acceptance. Phase 3 focuses on field validation of quality decisions.

  • Turn model-specific requirements into reusable measurement plans: stages, points and sensor assignments.
  • Establish comparison evidence through separate reference recording and libraries, then manage thresholds and versions.
  • Execute per item and distinguish NG/OK/indeterminate results, trace deviations to positions and features, and teach users the workflow.
How to inspect units across machine models
Phase 2 software functionality passed acceptance. Phase 3 is validating pass/fail decisions on field samples. (Enlarge image)

Inspection solution and modules

ModuleDesign and system mechanism
Measurement plans: models, stages and pointsTranslate field inspection requirements into configurable operating/comparison specifications.

Define applicable models, stage order, points, sensor configuration, measurement conditions and comparison rules; separate plan versions from execution records.

Reference recording and librariesBuild traceable evidence for good-reference comparisons.

Reference and inspection runs serve different purposes. Recording requires human confirmation before inclusion, stage/point coverage checks and retained reference versions/use states.

Work orders, test items and runsTest items in sequence on one fixture while keeping their records distinct.

Orders adopt plans/references and create test items and runs. Stage preparation checks sensors and positions before acquisition starts.

Thresholds, NG/OK and human reviewGround decisions and identify when a decision cannot be made.

Compare stages/points with their references and thresholds, retaining incomplete, insufficient-data or incompatible-reference reasons; manage changes through versions and reassessment rules.

Feature-deviation analysis and traceabilityTrace an overall result to positions and features needing review.

Show distributions, measured features and deviations against the adopted reference. Record reasons when required decision points lack data; deviation ranking does not identify a confirmed fault root cause.

System architecture and workflow

Architecture overview

Inputs
Model-specific requirements, plan stages/points, sensor assignments, reference samples and test items.
Process
Plans define the method, orders adopt versions and test items undergo measurement runs. Separate reference recording, human inclusion and threshold management, then compare stages/points and investigate feature deviations.
Outputs
NG/OK/indeterminate decisions, comparison evidence and traceability across stages/points/features, and an inspection workflow operators can use and learn.

The three principal UI levels organize work through plan lists, work-order operations and test-item dashboards. Underneath are runs, stages/points, references and decisions. UI levels, order tabs and interpretation levels are different concepts.

Domain model: plans, orders, test items and references
Logical relationships, not three UI tabs or deployment topology. Reference recording and inspection are separate; changes are versioned. Deviation localization is not fault-root-cause identification. (Enlarge image)

Workflow diagram

Inspection flow: model requirements, references, decisions and deviations
Aaron leads product development, algorithm design and experiments, and on-site training. Phase 2 software acceptance is complete. Phase 3 quality validation is in progress. (Enlarge image)

Recording alone does not create a good reference

Reference recording and inspection are separate; recorded good units require confirmation for inclusion. Later versions coordinate reference collection across orders of the same plan version. Sample correction, reference inclusion and threshold calculation are distinct; NG samples do not directly become good references. Stage and point coverage still matters.

Version and threshold changes must preserve prior decisions

Plans and good references are managed by version and usage state, with each measurement retaining its adopted comparison basis. Later threshold or sample changes do not silently rewrite prior results; updates follow an explicit reassessment or remeasurement workflow.

Retain traceability and state data-retention limits

Retain relationships among measurements, decisions and references for quality review. Raw readings and WAV have retention periods; complete permanent reconstruction is not promised. Feature deviations locate comparison differences, while root causes and formal quality performance require validation.

Interface and interaction

Plans: one configurable method for different models

I designed requirement-driven measurement plans and stage/point specifications, linking sensor assignments to comparison conditions. Plan changes remain separate from versions used by existing orders to protect historical results.

Work orders: apply the plan to each test item

Orders connect test items, runs, comparison details and results. Operators select items and start measurement, with reference management, review and reports integrated into the workflow rather than deep navigation.

Inspection workspace wireframe
Design wireframe · Fictional data. The plan, work order, and unit form a hierarchy. Operators can check measurement points, compare references, and handle missing readings in one workspace. (click to enlarge)

Measurement and interpretation: verify positions, then inspect deviations

Preparation is separate from measurement so operators can verify sensors, points and states first. After measurement, users can trace the overall result to a stage, measurement point, or feature difference. If a required point has no reading, the system shows an indeterminate result and identifies what is missing for review.

Key design decisions

Design the measurement solution before the per-item workflow

One fixture must measure different equipment models, each with its own stages, points and references. A permanent-equipment monitoring model can confuse test-item identity and comparison baselines.

I conceived the product around requirements and existing sensor capabilities, defining plans, work orders, test items and measurement runs. Plans carry stages/points, sensor configuration and comparison rules; each run retains the version and reference used.

Designed the workflow from measurement plans and reference management through NG/OK decisions and deviation tracing. Completed test versions, manuals, on-site demonstrations and training. Phase 2 software functionality acceptance is complete.

Consolidate five or six navigation levels into three core interface types

The initial AI-generated version met functional specifications but required five or six levels of navigation. Different back buttons led to different levels and sometimes created loops.

I reorganized the UI into plan lists, work orders and dashboards, merging reports, reviews and baseline management or moving them into dialogs. I adjusted typography, state and test-item displays, grouped navigation and primary actions near the lower center, and added arrow-key and Enter controls.

Completed the three core interface types and workflow improvements, receiving positive qualitative feedback from DQA.

Check operating mistakes separately from quality decisions

Physical sensors can be assigned to the wrong measurement point. A working flow also does not prove that quality thresholds are calibrated.

I separated setup confirmation from measurement and added sensor IDs, placement diagrams, and disconnection cues. I separated functional testing from calibration of decision criteria with field data.

Phase 2 software functionality acceptance is complete. Phase 3 evaluates whether field measurements, references and thresholds can support OK/NG decisions.

More technical detail

From field needs to technical acceptance

I clarified stages, measurement points, reference re-recording, and exceptions across equipment models. I defined conditions for setup, measurement, and decisions, then mapped them to work-order workflows, test cases, and functional acceptance so operators could train, run inspections, and report issues consistently.

Feed field issues back into the product

In October 2026, I demonstrated the system, trained operators, and traced a connection interruption to a time-synchronization issue. After resolving it, I brought field feedback back into development. Phase 2 acceptance covered the agreed software functionality.

Phase 3 QC: Defining and validating OK/NG decisions

After Phase 2 software functionality acceptance, I continue to analyze measurements and features. Phase 3 examines reference stability for conforming units, incorrect OK/NG decisions, and when the system should return an indeterminate result. I am preparing to align sample collection, quality labels, the QC question, and the scope of field validation with the customer.

Results and validation scope

Deliverables

Delivered configurable measurement, reference comparison, and deviation analysis workflows and trained operators on site. The software workflow passed Phase 2 acceptance. Phase 3 is testing whether the measurements can reliably distinguish passing from failing units, with additional samples and field validation planned.

Validation and limits

Phase 2 software functionality acceptance is complete. Phase 3 requires traceable field samples to validate OK/NG decisions, with customer alignment on data collection, the QC question, and scope. Classification performance and applicable equipment models still require validation.